Client receive-window credit timing fix
Client receive-window credit timing fix
Title
fix(client): release receive credit after reads
Target branch
main
Summary
The Client now returns stream receive-window credit only after the application consumes bytes. Previously, credit was returned when a frame moved from the receive queue into an internal buffer, which could over-credit a slow Server sender and fill its per-stream queue.
User impact
Large JavaScript assets and other bulk responses delivered through tunnelmesh-client forward tcp no longer receive premature RESETs caused by over-credit. This addresses the intermittent ERR_CONTENT_LENGTH_MISMATCH observed on 127.0.0.1:18080.
API, schema, and configuration impact
None. No API, database schema, protocol frame, window size, or configuration option changes.
Security and authorization impact
None. Existing stream authorization, policy validation, target restrictions, and audit behavior are unchanged.
Test evidence
- Red:
go test ./internal/client -run '^TestSessionFlowControlWaitsForApplicationReadBeforeWindowUpdate$' -count=1failed with a prematureWINDOW_UPDATEof 131072 bytes. - Green: the focused test passed after moving credit release to application-read time.
go test ./internal/client -run 'TestSessionFlowControl' -count=1passed.go test ./internal/client -count=1passed.go test -race ./internal/client -count=1passed.go vet ./internal/clientpassed.go test ./... -count=1passed.go test -race ./...passed.go vet ./...passed.git diff --checkpassed.
Release steps
- Merge after review and CI.
- Build and deploy the updated
tunnelmesh-client. - Restart local forwarding sessions. Server and Agent restarts are not required.
Rollback steps
Revert the merge commit and redeploy the previous Client binary. No persisted state or configuration migration is involved.
Reviewer focus
- Confirm credit is released for exactly the bytes copied to the caller.
- Confirm DATA queued before HALF_CLOSE is still drained before EOF.
- Confirm the window size remains 262144 and no queue capacity is changed.